Our Commercial Projects

Snowdon Drive, Winterhill, Milton Keynes

Back to Projects

Read More / Close

REDUCE, RE-USE THEN RECYCLE...

Major groundworks are under way in preparation for a new retail development on Snowdon Drive, Winterhill, Milton Keynes.

Our fleet of heavy earthmoving equipment is removing existing foundations and floor slabs from the previous buildings, then processing it into recycled aggregates for re-use on the new development. In excess of 10,000 cubic metres of material is being re-profiled to receive the new development. Working through recent bank holidays within tight timescales the job is progressing well. The prominent position of the site is an excellent pedestal to demonstrate the addition of two new 22 Tonne JCB excavators recently added to our growing fleet.

Client: Parkway Construction

Value: £485, 000

Major groundworks utilising our brand new earthmoving equipment are underway to prepare for a large new retail development in Winterhill, Milton Keynes.

All construction and demolition waste is crushed on site ready for re-use on the new development. The material produced is estimated to be in excess of 10,000 m³. Work continued over the bank holiday period within tight timescales but is progressing well.

Network Network

Network M40~ located off Overthorpe Road, Banbury, Oxfordshire

Back to Projects

Read More / Close

Construction of two large industrial units including bulk earthworks, drainage, pumping stations, storage tanks with associated service yard and car parking.

Main Contractor: Parkway Construction

Client: Parkway Construction

Engineers: Bailey Johnson Hayes (value £1.1m)

Duration: 25 weeks 2011 ~2012

Network Network

McAleer & Rushe CBX III ~ located off Midsummer Boulevard, CBX III Central Milton Keynes

Back to Projects

Read More / Close

Construction of 2No Hotels and retail units, bulk earthworks, drainage, section 278 works, associated service road, block paving and car drop off point.

Client: Frontier Estates

Engineers: SKM (value £750,000)

Duration: 35 weeks

McAleer & Rushe - Image01 McAleer & Rushe - Image02

Network Rail, National Centre - CMK

Back to Projects

Read More / Close

The development will provide office accommodation for Network Rail staff for 2700 people, including support facilities such as meeting rooms and catering. Smith Construction has been involved in two phases: the first was all the enabling works and infrastructure drainage, the second phase is the external works which consists of service ducts, block paving, channel drainage, section 278 works and street furniture.

Client: Network Rail

Main Contractor: Bam (value £1.2m)

Duration: 45 weeks 2010~2012

Network Rail - Image01 Network Rail - Image01

Routeco Ltd, Energy Park, Knowlhill, Milton Keynes

Back to Projects

Read More / Close

The development consists of a new 4 storey office block approx 42,000ft of floor space, together with associated bulk earthworks, in-situ reinforced concrete foundations, attenuation features, drainage, car parking and landscaped areas.

Main Contractor: Winvic Construction Ltd (value £700,000)

Duration: 30 weeks 2008~2009

Routeco - Image01 Routeco - Image01

Our Clients Include:

  • BAM Construction
  • Gallaghers Development
  • Parkway Construction
  • KIER MARRIOTTS
  • Goldbeck Construction (UK) Ltd
  • Orbit Homes
  • Bellcross Homes
  • Inter MK
  • Places for People
  • Buckingham Group
  • Parks Trust
  • Milton Keynes Highway
  • Homes & Communities Agency
  • Milton Keynes Borough Council
  • WINVIC Construction